Material Flow & Layout

2D computer animation of production flow

 

Computer based simulation of production flow is used in many industrial sectors in connection with the design of manufacturing facilities and logistics systems.

We can simulate systems and facilities in preparation for optimisation of your product flow, and via our wide experience in processes, automation and systematic maintenance we have a strong basis for repairing your equipment and process problems, which often can constitute bottlenecks in your facility.

2D computer animated productionflow.

We offer guidance in optimal facility design, output analyses, turnaround times, bottleneck identification, choice of automation equipment and subsequently education in use and maintenance of developed simulation models.

Over the years we have build up comprehensive competence in these activities with 2D and 3D flow simulation as a starting point. We carry out assignments based on 2D data information in the advanced 2D flow simulation system Promodel and 3D simulations in the Quest, ROBCAD and Catia systems.

What you can achieve from a simulation model depends on your production characteristics, but generally the advantages are:

  • Thorough knowledge of and larger insight in connections in the production
  • Documentation of the production’s present capacity and potentials and the effect of changes
  • Revelation of “hidden” limitations in the production, which can prevent poor investments
  • Inspirational tool for methods and improvements of the production machinery
  • Tools for production planning.

Our concrete optimisation suggestions can result in:

  • Reduced turnaround / lead time
  • Reduced waste
  • Less change / higher productivity / better product mix
  • Less buffers and inventory
  • Savings on investments.




Please contact us for further information.


FORCE Technology: Park Allé 345, DK-2605 Brøndby  Phone: +45 43 26 70 00  Fax: +45 43 26 70 11  e-mail: info@forcetechnology.com