Current Results

  • The main principal of the WindSea floater has been proved correct
  • The total energy production for a given configuration has been calculated
  • The power production of the system has been calculated and verified in test to be 93 % of the theoretical maximum, based on three stand alone turbines
  • Wake effect: The results from the test and WindSea’s calculations are in accordance with third party calculations (RISØ).

 

 

 

 

            Contact us

            Henning Arnøy
            Managing Director
            +47 64 00 35 49
            Send message to Henning
            FORCE Technology: Park Allé 345 DK-2605 Brøndby  Phone: +45 43 26 70 00  Telefax: +45 43 26 70 11  e-mail: force@force.dk